Drainage consolidation
Drainage consolidation method, also known as preloading method, includes preloading method, overload preloading method, vacuum preloading method, combined vacuum and stacking method, groundwater level reduction method and electroosmosis method.
Under the preloading force, the pore water in the soft clay soil is discharged, the soil is consolidated, the pore volume in the soil is reduced, and the soil strength is increased, which reduces the settlement after foundation construction and improves the bearing capacity of the foundation.
Soft Soil Treatment Specialist, China Wick Drains, Prefabricated Vertical Drains
Subscribe to:
Post Comments (Atom)
Prefabricated vertical drains are commonly used materials in soft soil foundation treatment
Plastic drainage boards are commonly used materials in soft soil foundation treatment. In vacuum preloading and load preloading treatment o...
-
Vacuum preloading reinforcement mechanism The vacuum preloading method uses atmospheric pressure as a preloading load. Firstly, a la...
-
Principle of vacuum preloading The vacuum preloading is to first lay a sand cushion layer of about 30~50cm thick on the soft soil foundat...
-
Dredging is to dredge, widen or dig deep waters such as deep rivers and lakes, and use manmade power or machinery to carry out underwater ea...
No comments:
Post a Comment